TABLE OF CONTENTS

I. INTRODUCTION

II. METHOD

INTERVIEW PARTICIPANTS

INTERVIEW PROCEDURES AND MATERIALS

ANALYSIS PROCEDURE

III. ATIS TECHNOLOGY OVERVIEW

ATIS ARCHITECTURE ASSUMPTIONS

BASIC ATIS SUBSYSTEMS

PORTABLE ATIS TECHNOLOGIES

CVO SYSTEMS

IV. SYSTEM DEVELOPMENT OBJECTIVES AND SYSTEM PERFORMANCE OBJECTIVES, MEASURES, AND REQUIREMENTS

DECREASED TRAFFIC CONGESTION

Institutional Performance Objectives, Measures, and Requirements

Private Vehicle Driver Performance Objectives, Measures, and Requirements

CVO Performance Objectives, Measures, and Requirements

IMPROVED SAFETY

Institutional Performance Objectives, Measures, and Requirements

Private Vehicle Driver Performance Objectives, Measures, and Requirements

CVO Performance Objectives, Measures, and Requirements

INCREASED AND HIGHER QUALITY MOBILITY

Institutional Performance Objectives, Measures, and Requirements

Private Vehicle Driver Performance Objectives, Measures, and Requirements

CVO Performance Objectives, Measures, and Requirements

IMPROVED ENVIRONMENTAL QUALITY AND ENERGY EFFICIENCY

Institutional Performance Objectives, Measures, and Requirements

Private Vehicle Driver Performance Objectives, Measures, and Requirements

CVO Performance Objectives, Measures, and Requirements

IMPROVED ECONOMIC PRODUCTIVITY

Institutional Performance Objectives, Measures, and Requirements

Private Vehicle Driver Performance Objectives, Measures, and Requirements

CVO Performance Objectives, Measures, and Requirements

SUMMARY

V. SCENARIO OVERVIEW

TRANSPORTATION COMMUNITY INPUT PERTINENT TO ATIS SCENARIOS

IRANS Scenario Input

IMSIS Scenario Input

ISIS Scenario Input

IVSAWS Scenario Input

CVO-Specific Scenario Input

SUMMARY OF PRELIMINARY SCENARIOS DEVELOPED FOR THE PRESENT PROJECT

Private Vehicle Scenarios

Commercial Vehicle Operations Scenarios

VI. IRANS OPERATIONAL CAPABILITIES AND SCENARIOS

OPERATIONAL CAPABILITIES OF IRANS

OPERATIONAL SCENARIOS FOR IRANS

Private Vehicle Scenarios

P1: Preliminary Scenario for Tasks C and E

P2: Preliminary Scenario for Tasks C and E

P3: Preliminary Scenario for Tasks C and E

Commercial Vehicle Scenarios

C1: Preliminary Scenario for Tasks C and E

C2: Preliminary Scenario for Tasks C and E

C3: Preliminary Scenario for Tasks C and E

VII. IMSIS OPERATIONAL CAPABILITIES AND SCENARIOS

OPERATIONAL CAPABILITIES OF IMSIS

OPERATIONAL SCENARIOS FOR IMSIS

Private Vehicle Scenarios

P4: Preliminary Scenario for Tasks C and E

P5: Preliminary Scenario for Tasks C and E

P6: Preliminary Scenario for Tasks C and E

Commercial Vehicle Scenarios

C4: Preliminary Scenario for Tasks C and E

VIII. ISIS OPERATIONAL CAPABILITIES AND SCENARIOS

OPERATIONAL CAPABILITIES OF ISIS

OPERATIONAL SCENARIOS FOR ISIS

Private Vehicle Scenarios

P7: Preliminary Scenario for Tasks C and E

P8: Preliminary Scenario for Tasks C and E

P9: Preliminary Scenario for Tasks C and E

Commercial Vehicle Scenarios

C5: Preliminary Scenario for Tasks C and E

C6: Preliminary Scenario for Tasks C and E

IX. IVSAWS OPERATIONAL CAPABILITIES AND SCENARIOS

OPERATIONAL CAPABILITIES OF IVSAWS

OPERATIONAL SCENARIOS FOR IVSAWS

Private Vehicle Scenarios

P10: Preliminary Scenario for Tasks C and E

P11: Preliminary Scenario for Tasks C and E

P12: Preliminary Scenario for Tasks C and E

Commercial Vehicle Scenarios

C7: Preliminary Scenario for Tasks C and E

C8: Preliminary Scenario for Tasks C and E

C9: Preliminary Scenario for Tasks C and E

C10: Preliminary Scenario for Tasks C and E

X. CVO OPERATIONAL CAPABILITIES AND SCENARIOS

OPERATIONAL CAPABILITIES SPECIFIC TO CVO

OPERATIONAL SCENARIOS FOR CVO-SPECIFIC CAPABILITIES

In-Vehicle Scenarios

C11: Preliminary Scenario for Tasks C and E

Out-of-Vehicle Scenarios

C12: Preliminary Scenario for Tasks C and E

C13: Preliminary Scenario for Tasks C and E

C14: Preliminary Scenario for Tasks C and E

APPENDIX A. SUMMARY OF SURVEY RESPONSES

REFERENCES

LIST OF FIGURES

Figure 1. Mean importance ratings for ATIS subsystems in supporting the overall ATIS technology objectives for private vehicle and commercial vehicle applications

Figure 2. Mean importance ratings for five development objectives in meeting overall ATIS technology objectives for private and commercial vehicle applications

Figure 3. Mean importance ratings for ATIS subsystems in meeting the objective of decreasing traffic congestion for private and commercial vehicle applications

Figure 4. Mean importance ratings for ATIS subsystems in meeting the objective of improved safety for private and commercial vehicle applications

Figure 5. Mean importance ratings for ATIS subsystems in meeting the objective of increased and higher quality mobility for private and commercial vehicle applications

Figure 6. Mean importance ratings for ATIS subsystems in meeting the objective of improved environmental quality and energy efficiency for private and commercial vehicle applications

Figure 7. Mean importance ratings for ATIS subsystems in meeting the objective of improved economic productivity for private and commercial vehicle applications

LIST OF TABLES

Table 1. Summary of interview participants

Table 2. Decreased traffic congestion objectives, measures, and performance requirements

Table 3. Improved safety objectives, measures, and performance requirements

Table 4. Increased and higher quality mobility objectives, measures, and performance requirements

Table 5. Improved environmental quality and energy efficiency objectives, measures, and performance requirements

Table 6. Improved economic productivity objectives, measures, and performance requirements

Table 7. Summary of private vehicle scenarios

Table 8. Summary of commercial vehicle operations scenarios

Table 9. Timeline of scenario P1 events

Table 10. Timeline of scenario P2 events

Table 11. Timeline of scenario P3 events

Table 12. Timeline of scenario C1 events

Table 13. Timeline of scenario C2 events

Table 14. Timeline of scenario C3 events

Table 15. Timeline of scenario P4 events

Table 16. Timeline of scenario P5 events

Table 17. Timeline of scenario P6 events

Table 18. Timeline of scenario C4 events

Table 19. Timeline of scenario P7 events

Table 20. Timeline of scenario P8 events

Table 21. Timeline of scenario P9 events

Table 22. Timeline of scenario C5 events

Table 23. Timeline of scenario C6 events

Table 24. Timeline of scenario P10 events

Table 25. Timeline of scenario P11 events

Table 26. Timeline of scenario P12 events

Table 27. Timeline of scenario C7 events

Table 28. Timeline of scenario C8 events

Table 29. Timeline of scenario C9 events

Table 30. Timeline of scenario C10 events

Table 31. Timeline of scenario C11 events

Table 32. Timeline of scenario C12 events

Table 33. Timeline of scenario C13 events

Table 34. Timeline of scenario C14 events

Table 35. Ratings of the importance of ATIS subsystems in supporting overall ATIS objectives

Table 36. Ratings of the importance of IVHS objectives in meeting the overall ATIS objectives

Table 37. Ratings of the importance of ATIS subsystems in meeting the objective of decreased traffic congestion

Table 38. Ratings of the importance of ATIS subsystems in meeting the objective of improved safety

Table 39. Ratings of the importance of ATIS subsystems in meeting the objective of increased and higher quality mobility

Table 40. Ratings of the importance of ATIS subsystems in meeting the objective of improved environmental quality and energy efficiency

Table 41. Ratings of the importance of ATIS subsystems in meeting the objective of improved economic productivity

LIST OF ABBREVIATIONS

ACS Automated Clearance Sensing

ATIS Advanced Traveler Information System

ATMS Advanced Traffic Management Systems

AVC Automated Vehicle Classification

AVI Automated Vehicle Identification

AVL Automated Vehicle Location

Caltrans California Department of Transportation

CI Confidence Interval

CVO Commercial Vehicle Operators

DOT Department of Transportation

EC Electronic Credentials

FHWA Federal Highway Administration

GPS Global Positioning System

IMSIS In-vehicle Motor Services Information Systems

IRANS In-vehicle Routing and Navigation Systems

ISIS In-vehicle Signing Information Systems

IVHS Intelligent Vehicle Highway System

IVSAWS In-Vehicle Safety Advisory and Warning Systems

NHTSA National Highway Transportation and Safety Administration

OBC On-Board Computer

PCD Personal Communications Device

R&D Research and Development

TARIF Trucks At Rest In Fog

TTD Telecommunications Device for the Deaf

TWC Two-Way real-time Communications

WIM Weigh In Motion